Original: $26.99
-70%$26.99
$8.10The Story
Gläs Curved Beaded Glass Dildo - Clear
The sensation of the Gläs Curved Beaded Glass Dildo's graduated-sized beads being inserted or removed from your most longing orifice can be incredibly thrilling as the differently sized beads pass through the entry.
It’s a delectable feeling that the Gläs Curved Beaded Glass Dildo delivers effortlessly with its gorgeous curvaceous form. Positioned to create a chain of beads that forms a gentle curve, the 5-inch Curved Glass Beaded Dildo is perfect for play. It also can contribute to an exciting vaginal play experience as well! This versatile toy can be used for solo play as well as kinky fun wit a companion.
Made of fracture-resistant glass, the 5” Curved Beaded Glass Dildo is also body-safe and hypoallergenic for comfortable, worry-free use. It is also safe to use with any and all lubes.
You can enhance the feel of this toy by warming or cooling it and experimenting with temperature play. When playtime is over, this dildo is easily cleaned with soap and water.
- 100% Borosilicate glass
- Handblown & handcrafted glass dildo
- Tapered tip for easy penetration
- Raised blue spiral for intense stimulation
- Hypoallergenic & fracture-resistant
- Compatible with all lubricants
- Non-porous & hygienic
- Easy to clean
- Temperature responsive for sensory play
- Lightweight, easy to maneuver
Measurements:
- Insertable length 3.75", width 1.25"

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.
Description
Gläs Curved Beaded Glass Dildo - Clear
The sensation of the Gläs Curved Beaded Glass Dildo's graduated-sized beads being inserted or removed from your most longing orifice can be incredibly thrilling as the differently sized beads pass through the entry.
It’s a delectable feeling that the Gläs Curved Beaded Glass Dildo delivers effortlessly with its gorgeous curvaceous form. Positioned to create a chain of beads that forms a gentle curve, the 5-inch Curved Glass Beaded Dildo is perfect for play. It also can contribute to an exciting vaginal play experience as well! This versatile toy can be used for solo play as well as kinky fun wit a companion.
Made of fracture-resistant glass, the 5” Curved Beaded Glass Dildo is also body-safe and hypoallergenic for comfortable, worry-free use. It is also safe to use with any and all lubes.
You can enhance the feel of this toy by warming or cooling it and experimenting with temperature play. When playtime is over, this dildo is easily cleaned with soap and water.
- 100% Borosilicate glass
- Handblown & handcrafted glass dildo
- Tapered tip for easy penetration
- Raised blue spiral for intense stimulation
- Hypoallergenic & fracture-resistant
- Compatible with all lubricants
- Non-porous & hygienic
- Easy to clean
- Temperature responsive for sensory play
- Lightweight, easy to maneuver
Measurements:
- Insertable length 3.75", width 1.25"























